WCOB 8th Floor & Skybridge Demolition
Demolition of the WCOB 8th Floor/Skybridge and upfit of an office suite in the WC Courthouse
Specifications
(click to expand/collapse)

Name | Size | ||
2024-3-12 2205-D WCOB 8th Floor + Skybridge Demo Specs | 3.8 MB |