NWC Exterior Hydronic Piping Project & RP2 Equipment Addition

Project is on Wake Technical Community College’s north campus located off of Louisburg Road in Raleigh NC. The Regional Plant 2 (RP-2) supports the cooling and heating needs of campus as one of the three (3) utility plants on campus. RP-2 was designed to accept a total of three chillers, cooling towers, and boiler. This project installs the second of the chillers, towers, boilers, pump and support equipment. This project also includes building the frame system supporting a third chiller, but not the chiller itself. Along with the equipment in RP-2, new underground heating hot water (HHW) and chilled water (CHW) piping will be extended from the existing MH-11 to the existing Building H along the east side of Building F and under existing Pedestrian Bridge 1 as well as toward a future Automotive building for connection to that projects hydronic system. The project will be delivered via single-prime bid to a general contractor
  Plans (click to expand/collapse)
Name Size
001-GI001 - TITLE SHEET 2.3 MB
002-GI002 - BUILDING CODE SUMMARY 4.7 MB
003-S-001 - STRUCTURAL GENERAL NOTES, LEGEND AND ABBREVIATIONS 299.8 KB
004-S-101 - PARTIAL REGIONAL PLANT COOLING TOWER FOUNDATION AND FRAMING PLAN - DETAILS 593.2 KB
005-S-102 - VAULT FOUNDATION AND TOP SLAB PLAN & DETAILS 634.6 KB
006-S-103 - PEDESTRIAN BRIDGE 1 MECHANICAL TRAPEZE FRAMING PLAN AND DETAILS 641.0 KB
007-C000 OVERALL EXISTING CONDITIONS PLAN 1.3 MB
008-C001 EXISTING CONDITIONS PLAN - AREA A 1.4 MB
009-C002 EXISTING CONDITIONS PLAN - AREA B 1.6 MB
010-C101 DEMOLITION & RESTORATION PLAN -AREA A 1.5 MB
011-C102 DEMOLITION & RESTORATION PLAN -AREA B 1.7 MB
012-C201 UTILITY PLAN -AREA A 1.4 MB
013-C202 UTILITY PLAN -AREA B 1.6 MB
014-C301 UTILITY PROFILES 599.5 KB
015-C401 NPDES STABILIZATION PLAN -AREA A 1.3 MB
016-C402 NPDES STABILIZATION PLAN -AREA B 1.6 MB
017-C501 TRAFFIC CONTROL PHASING PLAN -PHASE 1 932.2 KB
018-C502 TRAFFIC CONTROL PHASING PLAN -PHASE 2 934.8 KB
019-C503 TRAFFIC CONTROL PHASING PLAN -PHASE 3 935.2 KB
020-C504 TRAFFIC CONTROL PHASING PLAN -PHASE 4 1.0 MB
021-C601 EROSION & SEDIMENT CONTROL PLAN - AREA A 1.3 MB
022-C602 EROSION & SEDIMENT CONTROL PLAN - AREA B 1.6 MB
023-C603 EROSION & SEDIMENT CONTROL DETAILS 6.4 MB
024-C701 UTILITY DETAILS 626.1 KB
025-C702 RESTORATION DETAILS 3.5 MB
026-M001 MECHANICAL SYMBOLS AND ABBREVIATIONS 244.8 KB
027-M200 MECHANICAL ISOMETRIC 1.4 MB
028-M201 MECHANICAL PIPING PLAN -PLANT AREA 634.2 KB
029-M202 MECHANICAL PIPING PLAN -COOLING TOWER AREA 321.7 KB
030-M203 MECHANICAL SECTIONS 725.6 KB
031-M204 VAULT LAYOUT -NEW WORK 804.9 KB
032-M205 BRIDGE LAYOUT 750.4 KB
033-M206 BRIDGE SECTIONS 264.0 KB
034-M501 CHILLED WATER P&ID -NEW WORK 202.6 KB
035-M502 CONDENSER WATER P&ID -NEW WORK 228.5 KB
036-M503 HEATING HOT WATER P&ID -NEW WORK 198.3 KB
037-M504 BUILDING H P&ID -NEW WORK 221.5 KB
038-M701 MECHANICAL DETAILS 295.2 KB
039-M801 MECHANICAL SCHEDULES 174.5 KB
040-E001 ELECTRICAL LEGENDS AND ABBREVIATIONS 359.2 KB
041-E201 ELECTRICAL POWER PLAN -DEMONSTRATION AREA 266.7 KB
042-E202 ELECTRICAL POWER PLAN -PLANT AREA 342.4 KB
043-E203 ELECTRICAL POWER PLAN -COOLING TOWER AREA 228.1 KB
044-E401 ELEC. SPECIAL SYSTEMS -ROOF PLAN 326.9 KB
045-E601 ELECTRICAL ONE-LINE DIAGRAM 247.0 KB
046-E701 ELECTRICAL DETAILS 258.2 KB
047-E801 ELECTRICAL SCHEDULES 1.0 MB