NWC Exterior Hydronic Piping Project & RP2 Equipment Addition

Project is on Wake Technical Community College’s north campus located off of Louisburg Road in Raleigh NC. The Regional Plant 2 (RP-2) supports the cooling and heating needs of campus as one of the three (3) utility plants on campus. RP-2 was designed to accept a total of three chillers, cooling towers, and boiler. This project installs the second of the chillers, towers, boilers, pump and support equipment. This project also includes building the frame system supporting a third chiller, but not the chiller itself. Along with the equipment in RP-2, new underground heating hot water (HHW) and chilled water (CHW) piping will be extended from the existing MH-11 to the existing Building H along the east side of Building F and under existing Pedestrian Bridge 1 as well as toward a future Automotive building for connection to that projects hydronic system. The project will be delivered via single-prime bid to a general contractor
  Addendum 1 (click to expand/collapse)
  Addendum 2 (click to expand/collapse)
This is available for download to registered users. Log in now
Name Size
190711_Addendum 02 89.1 KB