Arbor Creek Greenway (TOHS #21-012)
The project generally includes approximately 2.9 total miles of trail construction,consisting of new 10-foot-wide trial construction (10-foot wide asphalt/stone with 2-footstone shoulders), 2 pedestrian bridge, 3 boardwalks, 1 parking area, and the associated clearing, drainage, erosion control, traffic control, and signage.
Plans
(click to expand/collapse)

Name | Size | ||
SE20.027.00 Arbor Creek Middle Creek Greenway 20211208 | 114.0 MB |