Arbor Creek Greenway (TOHS #21-012)
The project generally includes approximately 2.9 total miles of trail construction,consisting of new 10-foot-wide trial construction (10-foot wide asphalt/stone with 2-footstone shoulders), 2 pedestrian bridge, 3 boardwalks, 1 parking area, and the associated clearing, drainage, erosion control, traffic control, and signage.
Plan Holders
Date | Company | Contact |
12/20/21 10:28 am |
Construction Journal
400 SW 7th Street Stuart, FL 34944 |
Trip Burton
Tel: 7727812144
Fax: 800-581-7204
|
12/13/21 6:28 am |
Dodge Data and Analytics
2860 S State Hwy 161 Suite 160 #501 Grand Prairie, TX 75052 |
Jaya L
Tel: 413-376-7032
Fax: 609-336-2767
|