Arbor Creek Greenway (TOHS #21-012)
The project generally includes approximately 2.9 total miles of trail construction,consisting of new 10-foot-wide trial construction (10-foot wide asphalt/stone with 2-footstone shoulders), 2 pedestrian bridge, 3 boardwalks, 1 parking area, and the associated clearing, drainage, erosion control, traffic control, and signage.
Addendum 1
(click to expand/collapse)

Name | Size | ||
Addendum #1 | 716.7 KB |
Addendum 2
(click to expand/collapse)

Name | Size | ||
Arbor Creek Greenway Addendum 2 | 864.5 KB |
Addendum 3
(click to expand/collapse)

Name | Size | ||
Addendum #3 | 1.4 MB |
Other
(click to expand/collapse)

Name | Size | ||
Contractors Acknowledging Intent to Bid.docx | 23.1 KB |