U-6243 Holly Springs Road Widening Phase 2

U-6243 consists of approximately 7,950 LF of roadway widening along Holly Springs Road (SR 1152). Project will include grading, drainage, bridge construction, paving, curb and gutter, traffic control, pavement markings and markers, utilities, erosion control, signing, signals, and other related items as shown on the plans in accordance with these specifications and plans. All work shall be performed in accordance with the North Carolina Department of Transportation Standard Specifications for Roads and Structures dated January 2018 with all amendments and supplements.
Addendum 1 (click to expand/collapse)
This is available for download to registered users. Log in now
Name Size
2021-11-16 U6243 Addendum 1 5.1 MB
Contractors Acknowledging Intent to Bid 155.4 KB
Addendum 2 (click to expand/collapse)
This is available for download to registered users. Log in now
Name Size
U6243 Addendum 2 264.9 KB