Utley Creek Greenway Connection

The project generally includes 1,500 linear feet of new 10’ wide asphalt trail construction (10-foot wide asphalt, 2 footshoulders), 100 linear feet of prefabricated steel bridge construction (2 @ 50 feet), associated clearing, drainage, erosion control, signage and approximately 1,350 linear feet of repair and repaving of existing asphalt trail.
  Plans (click to expand/collapse)
Name Size
2021-09-14 C-5604JA Plans 41.2 MB