Utley Creek Greenway Connection

The project generally includes 1,500 linear feet of new 10’ wide asphalt trail construction (10-foot wide asphalt, 2 footshoulders), 100 linear feet of prefabricated steel bridge construction (2 @ 50 feet), associated clearing, drainage, erosion control, signage and approximately 1,350 linear feet of repair and repaving of existing asphalt trail.
  Addendum 1 (click to expand/collapse)
This is available for download to registered users. Log in now
Name Size
Addendum No 1 178.9 KB
  Advertisement for Bid (click to expand/collapse)
This is available for download to registered users. Log in now
Name Size
2021-09-14 C-5604JA Invitation to Bid 178.4 KB