Arbor Creek Greenway (TOHS #21-012)

The project generally includes approximately 2.8 total miles of trail construction, consisting of new 10-foot-wide trial construction (10-foot wide asphalt/stone with 2-foot stone shoulders), 1 pedestrian bridge, 3 boardwalks, 1 parking area, and the associated clearing, drainage, erosion control, traffic control, and signage.
  Specifications (click to expand/collapse)