Arbor Creek Greenway (TOHS #21-012)

The project generally includes approximately 2.8 total miles of trail construction, consisting of new 10-foot-wide trial construction (10-foot wide asphalt/stone with 2-foot stone shoulders), 1 pedestrian bridge, 3 boardwalks, 1 parking area, and the associated clearing, drainage, erosion control, traffic control, and signage.
Date Company Contact
1617615438
4/5/21 5:37 am
Dodge Data and Analytics 830 3rd Avenue, 6th floor
New York, NY 10022
Jaya L
Tel: 877-903-1909
Fax: 877-847-3512