Arbor Creek Greenway (TOHS #21-012)

The project generally includes approximately 2.8 total miles of trail construction, consisting of new 10-foot-wide trial construction (10-foot wide asphalt/stone with 2-foot stone shoulders), 1 pedestrian bridge, 3 boardwalks, 1 parking area, and the associated clearing, drainage, erosion control, traffic control, and signage.
  Addendum 1 (click to expand/collapse)
This is available for download to registered users. Log in now
Name Size
1305-20-133 Arbor Creek Greenway Geotech Report 4.0 MB
TOHS_Addendum 1_2021-04-13 2.8 MB
  Addendum 2 (click to expand/collapse)
This is available for download to registered users. Log in now
Name Size
TOHS_Addendum 2 plans 17.4 MB
TOHS_Addendum 2_Form-04-16-2021 825.6 KB