Green Oaks Parkway/New Hill Road Signal Project

Project consists of converting the existing 2-way stop controlled intersection located at Green Oaks Parkway and New Hill Road to a signal controlled intersection. Project will include signal installation, loop installation, junction boxes, directional drilling, and other related items as shown on the plans in accordance with these specifications and plans.
Date Company Contact
1601704417
10/3/20 1:53 am
Dodge Data and Analytics 830 3rd Avenue, 6th floor
New York, NY 10022
Jaya L
Tel: 877-903-1909
Fax: 877-847-3512